Back  RFI # 1205: 835 Service Date

Formal vs. Informal Help Informal Formal

Submitter

Julia Dunicheva

Description

Service date in loop 2110 can represent either single date (DTP01 = 472) or a period (DTP01 = 150 and 151).

Is it Ok to send just one date Period Start (150) or Period End (151)? Or if one is sent the other one is required ?

Response

If the service date is one day – the service took place on only one day and did not span multiple days, then you would use 472 with one date.

If the service spanned multiple dates you would put in 150 as the first day and 151 as the last day of the span of dates. If you are using 150 then you MUST use 151.
Submission 11/23/2010
Status Date 2/7/2011
Status F - Final
Primary References
Document 005010X221
Section2.4
Page194
Set ID835
Loop2110
Segment Position0800
Segment IDDTM