RFI Browser

Back  RFI # 2270: Date for Principal Procedure

Formal vs. Informal Help Informal Formal

Submitter

Julia Dunicheva

Description

When Principal procedure is reported in HI segment, loop 2300, it's reported along with Principal Procedure Date.

What date should be used to verify validity of the Procedure code (HI01-02):
- principal procedure date, sent in corresponding HI01-04,
or
- service date, calculated from Statement date (DTP*434) and/or Discharge date (Occurrence HI*BH) ?

Response

This issue is explicitly addressed in the 005010X223A2 TR3. The Loop 2300 element HI01-04 is defined as the Principle Procedure Date and relates directly to the Principle Procedure Code from the corresponding Loop 2300 element HI01-02.
Submission 2/20/2018
Status Date 3/28/2018
Status F - Final
Primary References
Document 005010X223
Section2.4
Page240
Set ID837
Loop2300
Segment IDHI
Element Position01
Component Position02
Industry NamePrincipal Procedure Code